This site is under active development. Got it!

MapLink™ | Procedures | Annual Monitoring Report

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Annual Monitoring Report
The proposed DCI shall meet the following monitoring standards:
 
The Permittee shall submit an annual monitoring report as detailed in the Permit in accordance with the findings of the EIR to the Administrator no later than January 31st of each year after approval of the DCI Conditional Use Permit. The report shall describe the phase of operation, if applicable, the nature of operation during the previous year, the size and nature of disturbance of the area affected by operation, the structures and facilities constructed, the number of on- and off-site truck trips and sizes of trucks, the area developed and primarily affected by the DCI, the quantities and type of materials extracted, transported, and disposed, the status of reclamation, including the size and type of activities and estimated cost of reclamation to be completed, the results of air, soil and ground or surface water monitoring, an updated ERP-P, and any other information requested by the Administrator;

If the Permittee fails to timely submit a report required under this Section, the Administrator may take any enforcement action available to her, including but not limited to suspension or revocation of the DCI Conditional Use Permit; and

Reports shall be kept on file as a matter of public record.

See § 11.8: GENERAL PERFORMANCE STANDARDS for complete, detailed information.